PowerSwitch Main Page
PowerSwitch
The UK's Peak Oil Discussion Forum & Community
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Hinkley point B watch.

 
Post new topic   Reply to topic    PowerSwitch Forum Index -> Nuclear Power
View previous topic :: View next topic  
Author Message
adam2
Site Admin


Joined: 02 Jul 2007
Posts: 8096
Location: North Somerset

PostPosted: Sun Jul 19, 2020 2:30 pm    Post subject: Hinkley point B watch. Reply with quote

Both reactors at Hinkley B are shut down for inspection of the graphite core.
At present reactor 7 is forecast to re start on December 14 and reactor 8 to restart on November 30.

As discussed elsewhere, the shutdown of the two reactors at Hunterston for a similar inspection has been prolonged with numerous delays.

I have therefore started this thread in order that we might keep an eye on Hinkley B and see if it reopens as expected.
The two reactors at Hinkley are well beyond their original design life, and one limiting factor is the cracking of the graphite blocks that form the core.

Under normal operating conditions such cracks are of no consequence. The concern is that an earthquake could distort the core and prevent full or correct insertion of the control rods.
That in turn could prevent a safe and controlled shutdown.
Various work arounds are possible including articulated control rods that should enter a distorted core, or reviewing the original design and deciding that a greater number of cracks are acceptable than was originally considered to be acceptable.

The lost output from Hinkley B is about 2% of UK peak demand, and is of little concern in the near term as demand is reduced by the pandemic.
In the longer term though less capacity could increase the risk of shortages.
_________________
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
Back to top
View user's profile Send private message
adam2
Site Admin


Joined: 02 Jul 2007
Posts: 8096
Location: North Somerset

PostPosted: Sat Oct 24, 2020 2:50 pm    Post subject: Reply with quote

First delay announced, one reactor is now forecast to re start on March 12 2021, no re start date for the other reactor announced.
_________________
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    PowerSwitch Forum Index -> Nuclear Power All times are GMT + 1 Hour
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group